Home Sequence Controls Utilities Magnets FNAL's accelerators Tevatron

 

 

 

 

 

 

 

Tevatron cycle

Accelerator Division

Please let us know if this link can be browsed from outside FNAL. It contains useful links to the accelerator support groups, online documentation, and the control room and coordinator's logbook.

 

LHC Inner Triplet Quads

(at Fermilab magnet test and assembly facility)

Lower Right: Q1 Quad Magnet. KEK, Japan assembly of cold mass, Fermilab final cryostat assembly. The Q1 and Q3 magnets literally make a world tour before finally arriving at CERN!
Upper Left: Q2 Quad Magnet. Longer, double quad in single cryostat. Complete assembly at Fermilab.

Note the final focus magnets are all named after workers children. These two are Katie and Isabel.

 

Beam Instrumentation

  1. Head-tail chromaticity measurement
  2. Tevatron Tune Fitters
  3. 1.7 GHz Schottky System:
    used to measure tunes and chromaticities

    Documentation: Ralph J. Pasquinelli 1.7 GHz Schottky Monitor System
  4. Problems
  5. Longitudinal instabilities