Injection plateau - before beam

 

  Entry Exit
Safe Beam Flag True True
Beam Presence Flag False True
BIS UP overides UP overides
Dump ready for pilot
user permit
ready for pilot
user permit
TDI

UP OK
Out

UP OK
Out

TCDQ UP OK
Out
UP OK
Out
Kickers Stand-by On
Injection BIS Extraction enabled Extraction enable

 

Power Converters

TDI to pilot settings - state change command to TDI state machine (or sub-procedure)

TCDQ to pilot settings - state change command to TCDQ state machine (or sub-procedure)

Enable Injection Kickers - state change command to Kickers

FiDeL

Parameter Control

Monitoring

Transfer Lines

Before the injection of a full batch one must ensure that all magnets in the transfer line and the LHC machine have their proper settings. If some magnets are not correctly set part of the injected beam can reach either the cold elements of the machine or some parts of the detectors

Here one must keep in mind that the transfer lines use pulsed magnets and ensuring a proper setting of all the magnets requires a well defined checklist and interlock system. In the case of a full batch injection operation errors at the MKI and MSI elements can lead to hardware damage in the LHC machine. Thus, when changing from the pilot bunch injection mode to the full batch injection changes to the injection settings (this includes orbit changes at the TDI) must be excluded by an interlock system.