We need to be able to dump one beam without provoking a PM. The use cases:
First question(s):
Further, given the ability to only dump one beam, we need to be able to supress the post-mortem.
OR
We need to be able to post-mortem one beam without compromising a full post-mortem on the other beam.
(even then we don't want the post-mortem process on beam A to prevent safe re-injection of beam within, say, 15 seconds.
Sticking something between the BIC and the timing system (possibly with a timing receiver card) would appear to be appropriate. This box could decide whether or not to pass a edge to the CTG.
| PM Triggered by timing event | Self triggering | Dead time | Beam 1 beam 2 separate PM possible? | |
| Power converters | Y | Y | Not planned - would have to implement an extra buffer. | |
| RF | Y | No problem | ||
| Transverse damper | Separate systems | |||
| Beam dump | Beam Permit | Y | Separate systems | |
| Injection kickers | Separate systems | |||
| Collimators | Y | |||
| QPS | N | Y | Long | No - dump both beams |
| PIC | N | - | Both beams dumped | |
| BIC | Timing a standard user input | - | Seperate systems - | |
| BPM | BST | Y | ||
| BLM | BST | Kind of | ||
| Tune meter | BST | Y | ||
| Screens | Y | |||
| BCT | Y | |||
| AGM | Y | |||
| SRM | Y | |||
| Wire scanners | Y | |||
| IPM | Y |